XQC Picture Gallery
Flight 1, 12/4/95, 350 Launch Tower, White Sands, NM
Vertical Integration Test
Previous
Page Next
Page Home
After the rocket is loaded into the launch tower, a vertical integration
test is performed. Like the horizontal integration test, the vertical integration
test is a full scale simulated launch sequence. Again this is to test the
readiness of the payload for launch. At this point only small adjustments
can be made to the payload without dissassembling the rocket which is difficult
at best once it has been loaded into the tower. It is now the day before
the launch and final preparations are being made. All GSE equipment has
been moved and reassembled in the launch block house. The next stage is
Launch.
Click on images for a larger view:
This page written and maintained by F. Scott Porter (email:
Frederick.S.Porter@gsfc.nasa.gov)
Responsible NASA official: F. Scott Porter
NASA Homepage.