XQC Picture Gallery
Flight 1, 12/4/95, 350 Launch Tower, White Sands, NM

Horizontal Integration Test


Next Page                Home

The payload is assembled on the floor of the Vehicle Assembly Building a few days before launch for pre-launch testing. A full scale simulated launch is performed to check the readiness of the payload for flight. After the horizontal integration testing is completed, any last minute problems are corrected and the payload is loaded into the launch tower. The following are some pictures taken during the horizontal integration.


Click on images for a larger view:

This page written and maintained by F. Scott Porter (email: Frederick.S.Porter@gsfc.nasa.gov)
Responsible NASA official: F. Scott Porter
NASA Homepage.

NASA Website Privacy Statement | NASA IT Security Information This page was last modified on May 16, 2001