XQC Picture Gallery
Flight 1, 12/4/95, 350 Launch Tower, White Sands, NM
Horizontal Integration Test
Next
Page Home
The payload is assembled on the floor of the Vehicle Assembly Building a few days before launch for pre-launch testing. A full scale simulated launch is performed to check the readiness of the payload for flight. After the horizontal integration testing is completed, any last minute problems are corrected and the payload is loaded into the launch tower. The following are some pictures taken during the horizontal integration.